Maxidome: Difference between revisions

From NURDspace
Line 28: Line 28:
== Fasteners ==
== Fasteners ==
* 7 mm wide zipties
* 7 mm wide zipties
= Cover construction =


= Design decisions =
= Design decisions =

Revision as of 09:10, 30 June 2015

Maxidome
NoPicture.png
Participants
Skills construction, grinding, drilling
Status Active
Niche Mechanics
Purpose Infrastructure
Tool No
Location
Cost
Tool category

Maxidome Property "Tool Image" (as page type) with input value "File:" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.

{{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}


Frame construction

Tubing

  • 30 x 'S' : 1.57m x 22mm steel
  • 40 x 'M' : 1.82m x 22mm steel
  • 50 x 'L' : 1.86m x 22mm steel

Hubs

  • 46x 40mm steel ring
  • 25 x 6-way rings
  • 6 x 5-way rings
  • 15 x 4-way rings

Fasteners

  • 7 mm wide zipties

Cover construction

Design decisions

  • The dome will be 9m in diameter
  • The tubes will be 22m steel tubes
  • The inner ring of the hub will be a 40mm external diameter steel ring, with a height of 25 mm.
  • The outer ring of the hub will be a 75mm external diameter PVC ring, with a height of 50mm.
  • Both ends of a steel pipe will be equipped with a 8mm hole, with it's centerpoint located 8mm from the edge.
  • The outer hub will be equipped with 24mm holes.

TODO

  • Acquire missing tools needed
  • Settle on size
  • Settle on tube diameter
  • Settle on hub design
  • Determine total length of tubing required
  • Find supply of steel tubing
  • Design hubcap
  • Print hubcaps
  • Purchase tubes
  • Select zipties
  • Purchase zipties
  • Cut tubes to required lengths
  • Drill tube ends so zipties can be fitted
  • Create assembly plan
  • Assemble in back yard