Maxidome: Difference between revisions

From NURDspace
No edit summary
 
(46 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Project
{{Project
|Name=Maxidome
|Name=Maxidome
|Skills=construction, grinding, drilling,  
|Skills=construction, grinding, drilling,
|Status=Active
|Status=Production
|Niche=Mechanics
|Niche=Mechanics
|Purpose=Infrastructure
|Purpose=Infrastructure
|Picture=
|Picture=IMG_20150807_205134.jpg
|Tool=No
|Tool=No
|Location=
|Cost=
|Category=
}}
}}
 
= Frame construction =
 
[[:File:Dome Instructions BOM.svg]]
= Construction =


== Tubing ==
== Tubing ==
Line 20: Line 16:
* 50 x 'L' : 1.86m x 22mm steel
* 50 x 'L' : 1.86m x 22mm steel


== Hubs ==
[[:File:Dome Instructions Pipe Layout.svg]]
* 46x 40mm steel ring
 
* 25 x 6-way rings
=== Construction  ===
* 6 x 5-way rings
[[:File:Dome Instructions Cover.svg]]
* 15 x 4-way rings
 
[[:File:Dome Instructions Hub.svg]]
 
[[:File:Dome Instructions Folding.svg]]
 
[[:File:Dome Instructions Build 1.svg]]
 
[[:File:Dome Instructions Build 2.svg]]
 
[[:File:Dome Instructions Build 3.svg]]
 
[[:File:Dome Instructions Build 4.svg]]
 
[[:File:Dome Instructions Top.svg]]
 
 


== Fasteners ==
== Fasteners ==
* 7 mm wide zipties
* 7 mm wide zipties
* Grommets
* Tent rope
= Cover construction =
TODO


= Design decisions =
= Design decisions =


* The dome will be 9m in diameter
* The dome is 4.5m high, 9m in diameter, 63m2 surface area.
* The tubes will be 22m steel tubes
* The tubes are 22mm (stainless?) steel tubes
* The inner ring of the hub will be a 40mm external diameter steel ring, with a height of 25 mm.
* The inner ring of the hub are a 40mm external diameter steel ring, with a height of 25 mm.
* The outer ring of the hub will be a 75mm external diameter PVC ring, with a height of 50mm.
* The outer ring of the hub are a 75mm external diameter steel ring, with a height of 50mm.
* Both ends of a steel pipe will be equipped with a 8mm hole, with it's centerpoint located 8mm from the edge.
* Both ends of a steel pipe are drilled with an 8mm hole, with it's center point located 8mm from the edge.
* The outer hub will be equipped with 24mm holes.
* The outer hub will be equipped with 24mm holes.
* The short pipes (S) (1.57m) are marked with BLACK tape
* The medium pipes (M) (1.82m) are marked with WHITE tape
* The long pipes (L) (1.86m) are marked with RED tape
* 140 grommets are needed
* 60 herrings are needed
* Special tape is used to provide "meat" to mount the grommets on the cover
== Cost ==
* Pipes 396 euro
* Covering material (Hermetix) 137 euro
* Hubrings: 1 node
* Zipties 20 euro
* 200m Shavelines: 63 euro
* 60 herrings: 12 euro
* Mounting tape for sailrings: 10.5 euro
* 140 Sailrings 21.80
* Sailring mount tool + shipping: 10
Total: 670.30 euro
= Useful links =
* http://www.cvtotaal.nl/cv-buis-22.html
* http://www.dekzeilenshop.be/nl-content1.asp
* http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/
* http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter.
* http://www.kabelbinders.nl/shop/Tiewraps-kabelbinders-naturel-wit-tie-wraps-colsonbandjes-bundelbanden/
= Material information =
* http://www.brokerskunststoffen.nl/productsheet/TULAN_HERMETIX%28R%29_115_.pdf
* http://www.knotandrope.com/Store/pc/viewPrd.asp?idproduct=127&idcategory=6#.Vcep_rZqwf4
* http://metaldepot.co.uk/product-stainless-steel-76mm-od-x-2mm-wall-tube.html


= TODO =
[[Category:Tent Designs]]
* Acquire missing tools needed
* <s>Settle on size</s>
* <s>Settle on tube diameter</s>
* <s>Settle on hub design</s>
* Determine total length of tubing required
* Find supply of steel tubing
* Design hubcap
* Print hubcaps
* Purchase tubes
* Select zipties
* Purchase zipties
* Cut tubes to required lengths
* Drill tube ends so zipties can be fitted
* Create assembly plan
* Assemble in back yard

Latest revision as of 00:35, 9 March 2016

Maxidome
IMG 20150807 205134.jpg
Participants
Skills construction, grinding, drilling
Status Production
Niche Mechanics
Purpose Infrastructure
Tool No
Location
Cost
Tool category

Maxidome

IMG_20150807_205134.jpg {{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost::{{{Cost}}} | }}

Frame construction

File:Dome Instructions BOM.svg

Tubing

  • 30 x 'S' : 1.57m x 22mm steel
  • 40 x 'M' : 1.82m x 22mm steel
  • 50 x 'L' : 1.86m x 22mm steel

File:Dome Instructions Pipe Layout.svg

Construction

File:Dome Instructions Cover.svg

File:Dome Instructions Hub.svg

File:Dome Instructions Folding.svg

File:Dome Instructions Build 1.svg

File:Dome Instructions Build 2.svg

File:Dome Instructions Build 3.svg

File:Dome Instructions Build 4.svg

File:Dome Instructions Top.svg


Fasteners

  • 7 mm wide zipties
  • Grommets
  • Tent rope

Cover construction

TODO


Design decisions

  • The dome is 4.5m high, 9m in diameter, 63m2 surface area.
  • The tubes are 22mm (stainless?) steel tubes
  • The inner ring of the hub are a 40mm external diameter steel ring, with a height of 25 mm.
  • The outer ring of the hub are a 75mm external diameter steel ring, with a height of 50mm.
  • Both ends of a steel pipe are drilled with an 8mm hole, with it's center point located 8mm from the edge.
  • The outer hub will be equipped with 24mm holes.
  • The short pipes (S) (1.57m) are marked with BLACK tape
  • The medium pipes (M) (1.82m) are marked with WHITE tape
  • The long pipes (L) (1.86m) are marked with RED tape
  • 140 grommets are needed
  • 60 herrings are needed
  • Special tape is used to provide "meat" to mount the grommets on the cover

Cost

  • Pipes 396 euro
  • Covering material (Hermetix) 137 euro
  • Hubrings: 1 node
  • Zipties 20 euro
  • 200m Shavelines: 63 euro
  • 60 herrings: 12 euro
  • Mounting tape for sailrings: 10.5 euro
  • 140 Sailrings 21.80
  • Sailring mount tool + shipping: 10

Total: 670.30 euro

Useful links

Material information