(→Hubs) |
No edit summary |
||
(46 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Project | {{Project | ||
|Name=Maxidome | |Name=Maxidome | ||
|Skills=construction, grinding, drilling, | |Skills=construction, grinding, drilling, | ||
|Status= | |Status=Production | ||
|Niche=Mechanics | |Niche=Mechanics | ||
|Purpose=Infrastructure | |Purpose=Infrastructure | ||
|Picture= | |Picture=IMG_20150807_205134.jpg | ||
|Tool=No | |Tool=No | ||
}} | }} | ||
= Frame construction = | |||
[[:File:Dome Instructions BOM.svg]] | |||
= | |||
== Tubing == | == Tubing == | ||
Line 20: | Line 16: | ||
* 50 x 'L' : 1.86m x 22mm steel | * 50 x 'L' : 1.86m x 22mm steel | ||
== | [[:File:Dome Instructions Pipe Layout.svg]] | ||
=== Construction === | |||
[[:File:Dome Instructions Cover.svg]] | |||
[[:File:Dome Instructions Hub.svg]] | |||
[[:File:Dome Instructions Folding.svg]] | |||
[[:File:Dome Instructions Build 1.svg]] | |||
[[:File:Dome Instructions Build 2.svg]] | |||
[[:File:Dome Instructions Build 3.svg]] | |||
[[:File:Dome Instructions Build 4.svg]] | |||
[[:File:Dome Instructions Top.svg]] | |||
== Fasteners == | == Fasteners == | ||
* 7 mm wide zipties | * 7 mm wide zipties | ||
* Grommets | |||
* Tent rope | |||
= Cover construction = | |||
TODO | |||
= Design decisions = | = Design decisions = | ||
* The dome | * The dome is 4.5m high, 9m in diameter, 63m2 surface area. | ||
* The tubes | * The tubes are 22mm (stainless?) steel tubes | ||
* The inner ring of the hub | * The inner ring of the hub are a 40mm external diameter steel ring, with a height of 25 mm. | ||
* The outer ring of the hub | * The outer ring of the hub are a 75mm external diameter steel ring, with a height of 50mm. | ||
* Both ends of a steel pipe | * Both ends of a steel pipe are drilled with an 8mm hole, with it's center point located 8mm from the edge. | ||
* The outer hub will be equipped with 24mm holes. | * The outer hub will be equipped with 24mm holes. | ||
* The short pipes (S) (1.57m) are marked with BLACK tape | |||
* The medium pipes (M) (1.82m) are marked with WHITE tape | |||
* The long pipes (L) (1.86m) are marked with RED tape | |||
* 140 grommets are needed | |||
* 60 herrings are needed | |||
* Special tape is used to provide "meat" to mount the grommets on the cover | |||
== Cost == | |||
* Pipes 396 euro | |||
* Covering material (Hermetix) 137 euro | |||
* Hubrings: 1 node | |||
* Zipties 20 euro | |||
* 200m Shavelines: 63 euro | |||
* 60 herrings: 12 euro | |||
* Mounting tape for sailrings: 10.5 euro | |||
* 140 Sailrings 21.80 | |||
* Sailring mount tool + shipping: 10 | |||
Total: 670.30 euro | |||
= Useful links = | |||
* http://www.cvtotaal.nl/cv-buis-22.html | |||
* http://www.dekzeilenshop.be/nl-content1.asp | |||
* http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/ | |||
* http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter. | |||
* http://www.kabelbinders.nl/shop/Tiewraps-kabelbinders-naturel-wit-tie-wraps-colsonbandjes-bundelbanden/ | |||
= Material information = | |||
* http://www.brokerskunststoffen.nl/productsheet/TULAN_HERMETIX%28R%29_115_.pdf | |||
* http://www.knotandrope.com/Store/pc/viewPrd.asp?idproduct=127&idcategory=6#.Vcep_rZqwf4 | |||
* http://metaldepot.co.uk/product-stainless-steel-76mm-od-x-2mm-wall-tube.html | |||
[[Category:Tent Designs]] | |||
Latest revision as of 00:35, 9 March 2016
Maxidome | |
---|---|
Participants | |
Skills | construction, grinding, drilling |
Status | Production |
Niche | Mechanics |
Purpose | Infrastructure |
Tool | No |
Location | |
Cost | |
Tool category |
IMG_20150807_205134.jpg {{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost::{{{Cost}}} | }}
Frame construction
File:Dome Instructions BOM.svg
Tubing
- 30 x 'S' : 1.57m x 22mm steel
- 40 x 'M' : 1.82m x 22mm steel
- 50 x 'L' : 1.86m x 22mm steel
File:Dome Instructions Pipe Layout.svg
Construction
File:Dome Instructions Cover.svg
File:Dome Instructions Hub.svg
File:Dome Instructions Folding.svg
File:Dome Instructions Build 1.svg
File:Dome Instructions Build 2.svg
File:Dome Instructions Build 3.svg
File:Dome Instructions Build 4.svg
File:Dome Instructions Top.svg
Fasteners
- 7 mm wide zipties
- Grommets
- Tent rope
Cover construction
TODO
Design decisions
- The dome is 4.5m high, 9m in diameter, 63m2 surface area.
- The tubes are 22mm (stainless?) steel tubes
- The inner ring of the hub are a 40mm external diameter steel ring, with a height of 25 mm.
- The outer ring of the hub are a 75mm external diameter steel ring, with a height of 50mm.
- Both ends of a steel pipe are drilled with an 8mm hole, with it's center point located 8mm from the edge.
- The outer hub will be equipped with 24mm holes.
- The short pipes (S) (1.57m) are marked with BLACK tape
- The medium pipes (M) (1.82m) are marked with WHITE tape
- The long pipes (L) (1.86m) are marked with RED tape
- 140 grommets are needed
- 60 herrings are needed
- Special tape is used to provide "meat" to mount the grommets on the cover
Cost
- Pipes 396 euro
- Covering material (Hermetix) 137 euro
- Hubrings: 1 node
- Zipties 20 euro
- 200m Shavelines: 63 euro
- 60 herrings: 12 euro
- Mounting tape for sailrings: 10.5 euro
- 140 Sailrings 21.80
- Sailring mount tool + shipping: 10
Total: 670.30 euro
Useful links
- http://www.cvtotaal.nl/cv-buis-22.html
- http://www.dekzeilenshop.be/nl-content1.asp
- http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/
- http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter.
- http://www.kabelbinders.nl/shop/Tiewraps-kabelbinders-naturel-wit-tie-wraps-colsonbandjes-bundelbanden/