No edit summary |
|||
Line 1: | Line 1: | ||
{{Project | {{Project | ||
|Name=Minidome | |Name=Minidome | ||
|Skills=Construction, | |Skills=Construction, | ||
|Status=Finished | |Status=Finished | ||
|Niche=Mechanics | |Niche=Mechanics | ||
|Purpose=Use in other project | |Purpose=Use in other project | ||
|Picture= | |Picture=Dome Construction 9.jpg | ||
|Tool=No | |Tool=No | ||
|Location= | |Location= | ||
Line 11: | Line 11: | ||
|Category= | |Category= | ||
}} | }} | ||
=Construction of the pipe cleaner connectors= | =Construction of the pipe cleaner connectors= | ||
<gallery> | <gallery> |
Latest revision as of 09:44, 30 June 2015
Minidome | |
---|---|
Participants | |
Skills | Construction |
Status | Finished |
Niche | Mechanics |
Purpose | Use in other project |
Tool | No |
Location | |
Cost | |
Tool category |
Dome Construction 9.jpg {{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}
Construction of the pipe cleaner connectors
As above, fold the first(2 o'clock) and fifth(10 o'clock) spokes around the sixth (12 o'clock) in the opposite direction to before. Finally, fold the second(4 o'clock) and fourth(7 o'clock) spokes around the fourth (6 o'clock) in reverse again to produce a 6-way connector (white hubs). For a 5-way connector (red hubs), loop the short end around the core and trim it short.
Minidome strut construction
Cut:
- 50x 15.5cm tubes (L, purple in construction diagrams)
- 40x 15cm tubes (M, red)
- 30x 13cm tubes (S, blue)
Dome construction
-Things to remember:-
- The dome only consists of two types of triangle - LLM and MSS. If you ever construct any that don't match these, something has gone wrong.
- All six 5-way hubs can be populated with M pipes before further assembly
- Similarly, 5 6-way hubs can be populated with only L pipes.
- M struts never occur next to each other on any single hub.
Join the remaining spaces up, connecting two MSS triangles with an M-pipe, and everything else with an L-pipe in an L-L-M pattern as you go around. Initially this will put a lot of stress on the freshly made joints, so on large scale make sure you have someone to help lift the dome with you as you complete.