Line 15: | Line 15: | ||
= Construction = | = Construction = | ||
Tubing | == Tubing == | ||
* 30 x 'S' : 1.57m x 22mm steel | * 30 x 'S' : 1.57m x 22mm steel | ||
* 40 x 'M' : 1.82m x 22mm steel | * 40 x 'M' : 1.82m x 22mm steel | ||
* 50 x 'L' : 1.86m x 22mm steel | * 50 x 'L' : 1.86m x 22mm steel | ||
== Hubs == | |||
46x 40mm steel ring | |||
25 x 6-way rings | |||
6 x 5-way rings | |||
15 x 4-way rings | |||
= Design decisions = | = Design decisions = |
Revision as of 09:08, 30 June 2015
Maxidome | |
---|---|
Participants | |
Skills | construction, grinding, drilling |
Status | Active |
Niche | Mechanics |
Purpose | Infrastructure |
Tool | No |
Location | |
Cost | |
Tool category |
Maxidome Property "Tool Image" (as page type) with input value "File:" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.
{{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}
Construction
Tubing
- 30 x 'S' : 1.57m x 22mm steel
- 40 x 'M' : 1.82m x 22mm steel
- 50 x 'L' : 1.86m x 22mm steel
Hubs
46x 40mm steel ring 25 x 6-way rings 6 x 5-way rings 15 x 4-way rings
Design decisions
- The dome will be 9m in diameter
- The tubes will be 22m steel tubes
- The inner ring of the hub will be a 40mm external diameter steel ring, with a height of 25 mm.
- The outer ring of the hub will be a 75mm external diameter PVC ring, with a height of 50mm.
- Both ends of a steel pipe will be equipped with a 8mm hole, with it's centerpoint located 8mm from the edge.
- The outer hub will be equipped with 24mm holes.
- Acquire missing tools needed
Settle on sizeSettle on tube diameterSettle on hub design- Determine total length of tubing required
- Find supply of steel tubing
- Design hubcap
- Print hubcaps
- Purchase tubes
- Select zipties
- Purchase zipties
- Cut tubes to required lengths
- Drill tube ends so zipties can be fitted
- Create assembly plan
- Assemble in back yard