Maxidome: Difference between revisions

From NURDspace
Line 114: Line 114:
* http://www.dekzeilenshop.be/nl-content1.asp
* http://www.dekzeilenshop.be/nl-content1.asp
* http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/
* http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/
* http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter.


[[Category:Tent Designs]]
[[Category:Tent Designs]]

Revision as of 18:30, 15 July 2015

Maxidome
NoPicture.png
Participants
Skills construction, grinding, drilling
Status Active
Niche Mechanics
Purpose Infrastructure
Tool No
Location
Cost
Tool category

Maxidome Property "Tool Image" (as page type) with input value "File:" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.

{{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}


Frame construction

Tubing

  • 30 x 'S' : 1.57m x 22mm steel
  • 40 x 'M' : 1.82m x 22mm steel
  • 50 x 'L' : 1.86m x 22mm steel

Hubs

  • 46x 40mm steel ring
  • 25 x 6-way rings
  • 6 x 5-way rings
  • 15 x 4-way rings

Construction of full scale ziptie hub prototype

Fasteners

  • 7 mm wide zipties
  • Grommets
  • Tent rope

Cover construction

Container construction

We need one or more containers to be able to transport the dome in. Before we can build a container we need to figure out what the optimal design would be. A wooden crate? Multiple wooden crates? Plastic bag? Duffelbag? Plz help think

Design decisions

  • The dome will be 9m in diameter
  • The tubes will be 22m steel tubes
  • The inner ring of the hub will be a 40mm external diameter steel ring, with a height of 25 mm.
  • The outer ring of the hub will be a 75mm external diameter PVC ring, with a height of 50mm.
  • Both ends of a steel pipe will be equipped with a 8mm hole, with it's centerpoint located 8mm from the edge.
  • The outer hub will be equipped with 24mm holes.
  • The short pipes (A) are marked with BLACK tape
  • The medium pipes (B) are marked with WHITE tape
  • The long pipes (C) are marked with RED tape

TODO

Frame construction

  • Acquire missing tools needed
  • Settle on size
  • Settle on tube diameter
  • Settle on hub design
  • Determine total length of tubing required
  • Find supply of steel tubing
  • Design hubcap
  • Print hubcaps
  • Purchase tubes
  • Select zipties
  • Purchase zipties
  • Cut tubes to required lengths
  • Mark tubes according to type
  • Deburr pipes
  • Drill tube ends so zipties can be fitted
  • Order rebar
  • Create assembly plan
  • Assemble in back yard
  • Settle on container solution (how are we going to transport the fucker?)

Cover construction

  • Request a sample of hermetix from supplier
  • Validate Hermetix as viable covering candidate. We'll see when we get it
  • Decide on covering material
  • Find supply of covering material
  • Extract required shapes from material
  • Decide on how to bind the shapes together
  • Create cool showoffy idiopolis artsy design for covering
  • Find the appropriate grommets to mount in the cover in order to rope the covering down (10 mm? 20 mm?)
  • Determine how many grommets are needed
  • Order grommets
  • Order grommet fastening tool, if the one we have does not fit
  • Order special tape like fabric to strengthen the joint between the cover and the grommet
  • Calculate how much rope we need 200m should be enough
  • Order rope
  • Find a method to cut holes in the fabric in order the mount the rivets

Container construction

  • Settle on container type
  • Design containers?
  • Build containers


Cost

  • Pipes 396 euro
  • Covering material (Hermetix) 137 euro
  • Zipties 20 euro
  • 200m Shavelines: 61 euro