InfraRefreshKlusDagAvond: Difference between revisions

From NURDspace
No edit summary
No edit summary
Line 1: Line 1:
{{Event
{{Event
|Name=InfraRefreshKlusDag
|Name=InfraRefreshKlusDag
|Date=2018/12/21
|Date=2019/1/11
|Location=Space
|Location=Space
}}
}}
Line 7: Line 7:


The plan is a evening event, collect as many infra jobs as possible, and try to get them done.
The plan is a evening event, collect as many infra jobs as possible, and try to get them done.
== Update ==
Being pushed forward.


== Jobs list ==
== Jobs list ==

Revision as of 15:32, 21 December 2018

InfraRefreshKlusDagAvond
Name InfraRefreshKlusDag
Date 2019/1/11
DateEnd
Location Space
Contact
Attendees

As we've been pushing forward a lot of 'would be nice' infra jobs, we plan to dedicate some time to it.

The plan is a evening event, collect as many infra jobs as possible, and try to get them done.

Update

Being pushed forward.

Jobs list

  • Figure out radiatorknob requirements (slag, nutsize, etc)
  • Draw map of radiatorloops from the heater to determine mutual dependencies of radiators.
  • Map out the fire extinguishers , two of all the extinguishers are under contract. for service once a year (through volkshuis)
  • poke at home assistant?
  • install a home-assistant-interfacing-tablet on the wall somewhere? :D :D :D
  • go through 19" pile
  • add more plz

Attending

  • buZz
  • zarya
  • maybe niz
  • you?