m (→Useful links) |
|||
Line 104: | Line 104: | ||
* http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/ | * http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/ | ||
* http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter. | * http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter. | ||
= Material information = | |||
* http://www.brokerskunststoffen.nl/productsheet/TULAN_HERMETIX%28R%29_115_.pdf | * http://www.brokerskunststoffen.nl/productsheet/TULAN_HERMETIX%28R%29_115_.pdf | ||
* http://www.knotandrope.com/Store/pc/viewPrd.asp?idproduct=127&idcategory=6#.Vcep_rZqwf4 | |||
[[Category:Tent Designs]] | [[Category:Tent Designs]] |
Revision as of 20:29, 9 August 2015
Maxidome | |
---|---|
Participants | |
Skills | construction, grinding, drilling |
Status | Active |
Niche | Mechanics |
Purpose | Infrastructure |
Tool | No |
Location | |
Cost | |
Tool category |
IMG_20150807_205134.jpg {{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}
Frame construction
Tubing
- 30 x 'S' : 1.57m x 22mm steel
- 40 x 'M' : 1.82m x 22mm steel
- 50 x 'L' : 1.86m x 22mm steel
Hubs
- 46x 40mm steel ring
- 25 x 6-way rings
- 6 x 5-way rings
- 15 x 4-way rings
Construction of full scale ziptie hub prototype
Fasteners
- 7 mm wide zipties
- Grommets
- Tent rope
Cover construction
TODO
Container construction
We need one or more containers to be able to transport the dome in. Before we can build a container we need to figure out what the optimal design would be. A wooden crate? Multiple wooden crates? Plastic bag? Duffelbag? Plz help think
Design decisions
- The dome will be 9m in diameter
- The tubes will be 22m steel tubes
- The inner ring of the hub will be a 40mm external diameter steel ring, with a height of 25 mm.
- The outer ring of the hub will be a 75mm external diameter steel ring, with a height of 50mm.
- Both ends of a steel pipe will be equipped with a 8mm hole, with it's centerpoint located 8mm from the edge.
- The outer hub will be equipped with 24mm holes.
- The short pipes (S) are marked with BLACK tape
- The medium pipes (M) are marked with WHITE tape
- The long pipes (L) are marked with RED tape
- 140 grommets are needed
- 60 herrings are needed
- Special tape is used to provide "meat" to mount the grommets on the cover
Construction
- Start with a 5-way connector and put 5 S tubes around it. Tip these with 6-way connectors, and connect them with 5 M's to form five MSS triangles, putting the covers on the M pipes here oriented with the seams inwards.
- Add two L tubes to each of the outlying 6-ways leaving the last connection free. Connect these at the ends into five LLM triangles with more 6-way connectors.
- Fill up that last space with M tubes, and end those with 6-way connectors. Join all the outlying 6-way connectors up with more A tubes to make 10 more LLM triangles. This will lift the dome.
- Unfurl the covers down to the next layer and connect them with bolts.
- Attach internal guttering to seams
- Any 6-way with just L pipes to it, add two more L pipes. Any others, put two M pipes around it leaving the centre free.
- Make 5 more 5-way connectors with three S-tubes and put the middle to the remaining spaces where the B-tubes join. Then use more 6-way connectors to join up the next outer pair and form 10 more LLM and 10 MSS triangles.
- Lift the centre of the dome and connect the new 6-way connectors from above with an M-pipe.
- Add middle node to construction and spool out power cable for nodes
- Unfurl the covers down to the next layer and connect them with bolts.
- Extend internal guttering to seams
- Lift the pentagonal top face in now and tie it down to the lowest pipes.
- Construct the full outer ring made of LLM triplets in five sets. Line up the middle of the M-pipes with the five-way hubs.
- Get five+1 people to lift the dome at the five 5-way hubs. When this is done, position and pin in the last layer with pipes so that:
*S pipes go to 5-way hubs *Any 4-way hub with S pipes has only M as its partner *All others are L-pipes.
- Unfurl the covers down to the next layer and connect them with bolts.
- Extend internal guttering to seams
- Hammer in ten fishhooks around the dome to keep it down.
- Use pipe lagging to define a door or two
Cost
- Pipes 396 euro
- Covering material (Hermetix) 137 euro
- Hubrings: 1 node
- Zipties 20 euro
- 200m Shavelines: 63 euro
- 60 herrings: 12 euro
- Mounting tape for sailrings: 10.5 euro
- 140 Sailrings 21.80
- Sailring mount tool + shipping: 10
Total: 670.30 euro
Useful links
- http://www.cvtotaal.nl/cv-buis-22.html
- http://www.dekzeilenshop.be/nl-content1.asp
- http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/
- http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter.