Maxidome | |
---|---|
Participants | |
Skills | construction, grinding, drilling |
Status | Active |
Niche | Mechanics |
Purpose | Infrastructure |
Tool | No |
Location | |
Cost | |
Tool category |
Maxidome Property "Tool Image" (as page type) with input value "File:" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.
{{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}
Construction of Maxi (9m) dome
- 30 x 'S' : 1.57m x 22mm steel
- 40 x 'M' : 1.82m x 22mm steel
- 50 x 'L' : 1.86m x 22mm steel
- Enumerate required tools
10x 8mm drills to drill the holes in the tubes Grinder to cut a 40mm steel pipe into inner rings
- Acquire missing tools needed
Settle on sizeSettle on tube diameterSettle on hub design- Determine total length of tubing required
- Find supply of steel tubing
- Design hubcap
- Print hubcaps
- Purchase tubes
- Select zipties
- Purchase zipties
- Cut tubes to required lengths
- Drill tube ends so zipties can be fitted
- Create assembly plan
- Assemble in back yard