cablehubs | |
---|---|
Participants | |
Skills | Electronics |
Status | Planning |
Niche | Electronics |
Purpose | Infrastructure |
Tool | No |
Location | |
Cost | |
Tool category | Electronics |
cablehubs Property "Tool Image" (as page type) with input value "File:" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.
{{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}
Huh?
For the dome nodes, we're using a 60m long cable in a bus topology. To have more flexibility, we intend to cut up this long cable in different short sections. We'll need connectors to hook these sections back up in a topology of our choosing.
TODO
- Create schematic
- Find parts
- Create layout
- Create 3D design for cover
- 3-way hub
- 5-way hub
- Print covers
- Assemble
Ordering
- Order boards (35)
- Order parts (yet to be determined)