Maxidome | |
---|---|
Participants | |
Skills | construction, grinding, drilling |
Status | Active |
Niche | Mechanics |
Purpose | Infrastructure |
Tool | No |
Location | |
Cost | |
Tool category |
IMG_20150807_205134.jpg {{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}
Frame construction
Tubing
- 30 x 'S' : 1.57m x 22mm steel
- 40 x 'M' : 1.82m x 22mm steel
- 50 x 'L' : 1.86m x 22mm steel
Hubs
- 46x 40mm steel ring
- 25 x 6-way rings
- 6 x 5-way rings
- 15 x 4-way rings
Construction of full scale ziptie hub prototype
Fasteners
- 7 mm wide zipties
- Grommets
- Tent rope
Cover construction
Container construction
We need one or more containers to be able to transport the dome in. Before we can build a container we need to figure out what the optimal design would be. A wooden crate? Multiple wooden crates? Plastic bag? Duffelbag? Plz help think
Design decisions
- The dome will be 9m in diameter
- The tubes will be 22m steel tubes
- The inner ring of the hub will be a 40mm external diameter steel ring, with a height of 25 mm.
- The outer ring of the hub will be a 75mm external diameter PVC ring, with a height of 50mm.
- Both ends of a steel pipe will be equipped with a 8mm hole, with it's centerpoint located 8mm from the edge.
- The outer hub will be equipped with 24mm holes.
- The short pipes (A) are marked with BLACK tape
- The medium pipes (B) are marked with WHITE tape
- The long pipes (C) are marked with RED tape
- 140 grommets are needed
- 60 herrings are needed
- Special tape is used to provide "meat" to mount the grommets on the cover
TODO
Frame construction
Acquire missing tools neededSettle on sizeSettle on tube diameterSettle on hub designDetermine total length of tubing requiredFind supply of steel tubing- Design hubcap
- Print hubcaps
Purchase tubesSelect ziptiesPurchase ziptiesCut tubes to required lengthsMark tubes according to typeDeburr pipesDrill tube ends so zipties can be fitted- Order rebar
- Create assembly plan
- Assemble in back yard
- Settle on container solution (how are we going to transport the fucker?)
Cover construction
Request a sample of hermetix from supplierValidate Hermetix as viable covering candidate.We'll see when we get itDecide on covering materialFind supply of covering materialDecide on how to bind the shapes togetherFind the appropriate grommets to mount in the cover in order to rope the covering down (10 mm? 20 mm?) 10mmDetermine how many grommets are neededOrder grommetsOrder grommet fastening tool, if the one we have does not fitOrder special tape like fabric to strengthen the joint between the cover and the grommetCalculate how much rope we need200m should be enoughOrder ropeFind a method to cut holes in the fabric in order the mount the rivetsDetermine amount of herringsOrder herrings- Extract required shapes from material
- Create cool showoffy idiopolis artsy design for covering
Container construction
- Settle on container type
- Design containers?
- Build containers
Cost
- Pipes 396 euro
- Covering material (Hermetix) 137 euro
- Hubrings: 1 node
- Zipties 20 euro
- 200m Shavelines: 63 euro
- 60 herrings: 12 euro
- Mounting tape for sailrings: 10.5 euro
- 140 Sailrings 21.80
- Sailring mount tool + shipping: 10
Total: 670.30 euro
Useful links
- http://www.cvtotaal.nl/cv-buis-22.html
- http://www.dekzeilenshop.be/nl-content1.asp
- http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/
- http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter.