Maxidome | |
---|---|
Participants | |
Skills | construction, grinding, drilling |
Status | Active |
Niche | Mechanics |
Purpose | Infrastructure |
Tool | No |
Location | |
Cost | |
Tool category |
IMG_20150807_205134.jpg {{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}
Frame construction
Tubing
- 30 x 'S' : 1.57m x 22mm steel
- 40 x 'M' : 1.82m x 22mm steel
- 50 x 'L' : 1.86m x 22mm steel
Hubs
- 46x 40mm steel ring
- 25 x 6-way rings
- 6 x 5-way rings
- 15 x 4-way rings
Construction of full scale ziptie hub prototype
Fasteners
- 7 mm wide zipties
- Grommets
- Tent rope
Cover construction
Container construction
We need one or more containers to be able to transport the dome in. Before we can build a container we need to figure out what the optimal design would be. A wooden crate? Multiple wooden crates? Plastic bag? Duffelbag? Plz help think
Design decisions
- The dome will be 9m in diameter
- The tubes will be 22m steel tubes
- The inner ring of the hub will be a 40mm external diameter steel ring, with a height of 25 mm.
- The outer ring of the hub will be a 75mm external diameter PVC ring, with a height of 50mm.
- Both ends of a steel pipe will be equipped with a 8mm hole, with it's centerpoint located 8mm from the edge.
- The outer hub will be equipped with 24mm holes.
- The short pipes (A) are marked with BLACK tape
- The medium pipes (B) are marked with WHITE tape
- The long pipes (C) are marked with RED tape
- 140 grommets are needed
- 60 herrings are needed
- Special tape is used to provide "meat" to mount the grommets on the cover
TODO
Frame construction
Acquire missing tools neededSettle on sizeSettle on tube diameterSettle on hub designDetermine total length of tubing requiredFind supply of steel tubing- Design hubcap
- Print hubcaps
Purchase tubesSelect ziptiesPurchase ziptiesCut tubes to required lengthsMark tubes according to typeDeburr pipesDrill tube ends so zipties can be fitted- Order rebar
- Create assembly plan
- Assemble in back yard
- Settle on container solution (how are we going to transport the fucker?)
Cover construction
Request a sample of hermetix from supplierValidate Hermetix as viable covering candidate.We'll see when we get itDecide on covering materialFind supply of covering materialDecide on how to bind the shapes togetherFind the appropriate grommets to mount in the cover in order to rope the covering down (10 mm? 20 mm?) 10mmDetermine how many grommets are neededOrder grommetsOrder grommet fastening tool, if the one we have does not fitOrder special tape like fabric to strengthen the joint between the cover and the grommetCalculate how much rope we need200m should be enoughOrder ropeFind a method to cut holes in the fabric in order the mount the rivetsDetermine amount of herringsOrder herrings- Extract required shapes from material
- Create cool showoffy idiopolis artsy design for covering
Container construction
- Settle on container type
- Design containers?
- Build containers
Construction
- Start with a 5-way connector and put 5 S tubes around it. Tip these with 6-way connectors, and connect them with 5 M's to form five MSS triangles, putting the covers on the M pipes here oriented with the seams inwards.
- Add two L tubes to each of the outlying 6-ways leaving the last connection free. Connect these at the ends into five LLM triangles with more 6-way connectors.
- Fill up that last space with M tubes, and end those with 6-way connectors. Join all the outlying 6-way connectors up with more A tubes to make 10 more LLM triangles. This will lift the dome.
- Unfurl the covers down to the next layer and connect them with bolts.
- Attach internal guttering to seams
- Any 6-way with just L pipes to it, add two more L pipes. Any others, put two M pipes around it leaving the centre free.
- Make 5 more 5-way connectors with three S-tubes and put the middle to the remaining spaces where the B-tubes join. Then use more 6-way connectors to join up the next outer pair and form 10 more LLM and 10 MSS triangles.
- Lift the centre of the dome and connect the new 6-way connectors from above with an M-pipe.
- Add middle node to constrcution and spool out power cable for nodes
- Unfurl the covers down to the next layer and connect them with bolts.
- Extend internal guttering to seams
- Lift the pentagonal top face in now and tie it down to the lowest pipes.
- Construct the full outer ring made of LLM triplets in five sets. Line up the M-pipes with the five-way hubs.
- Get five people to lift the dome at the five 5-way hubs. When this is done, position and pin in the last layer with pipes so that:
* S pipes go to 5-way hubs *Any 4-way hub with S pipes has only M as its partner * All others are L-pipes.
- Unfurl the covers down to the next layer and connect them with bolts.
- Extend internal guttering to seams
- Hammer in ten fishhooks around the dome to keep it down.
- Use pipe lagging to define a door or two
Cost
- Pipes 396 euro
- Covering material (Hermetix) 137 euro
- Hubrings: 1 node
- Zipties 20 euro
- 200m Shavelines: 63 euro
- 60 herrings: 12 euro
- Mounting tape for sailrings: 10.5 euro
- 140 Sailrings 21.80
- Sailring mount tool + shipping: 10
Total: 670.30 euro
Useful links
- http://www.cvtotaal.nl/cv-buis-22.html
- http://www.dekzeilenshop.be/nl-content1.asp
- http://www.deboerdrachten.nl/landbouwplastic-landbouwfolie/4682013/Landbouwplastic-Hermetix-50-x-8-meter-wit-groen/
- http://www.touwenwinkel.nl/?p=productsMore&iProduct=1655&sName=aanbieding.-katoen-6-mm-hol-gevlochten--groen--haspel-100-meter.