Monkeyopolis: Difference between revisions

From NURDspace
(→‎Bill of Materials: - link to rebar)
m (s/price/measurement)
Line 1: Line 1:
{{Project
{{Project
|Name=MonkeyNurd
|Name=MonkeyNurd
|Skills=geometry,  
|Skills=geometry,
|Status=Planning
|Status=Planning
|Niche=Hardware
|Niche=Hardware
Line 26: Line 26:
=Bill of Materials=
=Bill of Materials=
* tarpaulin (at least 15*10m. like [http://www.dekzeilen-bestellen.nl/content/index.php?structure_id=4fb4e9bb71d21b6478f9afa9a3e85b66&item_id=PE150-1015 this one] for ~110eu)
* tarpaulin (at least 15*10m. like [http://www.dekzeilen-bestellen.nl/content/index.php?structure_id=4fb4e9bb71d21b6478f9afa9a3e85b66&item_id=PE150-1015 this one] for ~110eu)
* pvc-tubing (for the ribs, one every 2 meters. at 10*15 this means ~9 ribs in total. [http://www.wildkamp.nl/Pvc-afvoerbuis-met-gladde-einden-grijs-RAL-7037-KOMO-SN4-l-4-m-32-x-3-0-mm_pr_1010_cat_1001046 3.40eu/4 meter] + couplings = ~100 eu)
* pvc-tubing (for the ribs, one every 2 meters. at 10*15 this means ~9 ribs in total. 9*10m = 90m, but most tubes come in 4m length. 2*3+4=102 which means 9*3*4m = 108m. + 18*0.5  = 9m wide tube for the couplings.)
* rebar/herrings (the pvc-tubes need to fit over them. about 22*0.5m needed. generally really cheap (<1eu/meter) or free [http://www.dejonghandelsonderneming.nl/a-26189542/staven-betonijzer/betonijzer-staaf-o12-3-mtr-lang/#description ie.])
* rebar/herrings (the pvc-tubes need to fit over them. about 22*0.5m needed. generally really cheap (<1eu/meter) or free [http://www.dejonghandelsonderneming.nl/a-26189542/staven-betonijzer/betonijzer-staaf-o12-3-mtr-lang/#description ie.])
* lots and lots of rope (2x16m + 2x 2x25m + 18x0.3m~= 100m)
* lots and lots of rope (2x16m + 2x 2x25m + 18x0.3m~= 100m)

Revision as of 13:55, 8 July 2015

MonkeyNurd
MonkeyNurd.jpg
Participants
Skills geometry
Status Planning
Niche Hardware
Purpose Infrastructure
Tool No
Location
Cost
Tool category

MonkeyNurd Property "Tool Image" (as page type) with input value "File:" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.

{{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}

As Idiopolis, we have this super cool army tent at our disposal, but it's getting a bit flimsy, and it is not entirely sure how long it will survive. On top of that, all our party tent have been frankensteined into a mother of all partytents at haxogreen, but unfortunatly it has met its demise at the hand of the weather gods. I believe this provides us with ample arguments to consider a new construction for idiopolis, after all, CCC camp is just around the corner.

Plan

Build a so called 'monkeyhut', which is pretty much the default shelter-construction at Burning Man. It uses relatively little materials with a good amount of space in return.

Design

The basic design according to 'Jeremy':


Bill of Materials

  • tarpaulin (at least 15*10m. like this one for ~110eu)
  • pvc-tubing (for the ribs, one every 2 meters. at 10*15 this means ~9 ribs in total. 9*10m = 90m, but most tubes come in 4m length. 2*3+4=102 which means 9*3*4m = 108m. + 18*0.5 = 9m wide tube for the couplings.)
  • rebar/herrings (the pvc-tubes need to fit over them. about 22*0.5m needed. generally really cheap (<1eu/meter) or free ie.)
  • lots and lots of rope (2x16m + 2x 2x25m + 18x0.3m~= 100m)
  • ..

Cost

It would be nice if we could stay under 300 euros or something.