Moving to Diedenoort: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
| Line 19: | Line 19: | ||
| Oplevering old space || Planned || BuZz || 15-08-2013 | | Oplevering old space || Planned || BuZz || 15-08-2013 | ||
|- | |- | ||
| Negotiate content of new contract and agreement with Interim || Done | | Negotiate content of new contract and agreement with Interim || Done || FwD || | ||
|- | |- | ||
| Fiber possibilities || Investigated, now disconnected, hopefully soon in a legal way. || CrossWire || | | Fiber possibilities || Investigated, now disconnected, hopefully soon in a legal way. || CrossWire || | ||
|- | |- | ||
| Move BIT ADSL || Moved to "ISRA001/AUTOMAATRUIMTE, invoerkabel 1, dikader 3", but not found yet. KPN appointment 6-8 14:00-16:00 || buZz || | | Move BIT ADSL || Moved to "ISRA001/AUTOMAATRUIMTE, invoerkabel 1, dikader 3", but not found yet. KPN appointment 6-8 14:00-16:00 || buZz || 6-8 14:00-16:00 | ||
|- | |- | ||
| Discuss internet connection costs with other tenants || 1 cancellation received, others are positive and interested || FwD || | | Discuss internet connection costs with other tenants || 1 cancellation received, others are positive and interested || FwD || | ||
| Line 31: | Line 31: | ||
| New locks on server room door on 2nd floor || Done || FwD || | | New locks on server room door on 2nd floor || Done || FwD || | ||
|- | |- | ||
| New locks on space doors (current space doors are Nemef nr. 30 and can be bought anywhere) || | | New locks on space doors (current space doors are Nemef nr. 30 and can be bought anywhere) || Done, but in a mediocre way. No cover plates on the doors yet. || FwD || | ||
|- | |- | ||
| Sign contract with Interim || | | Sign contract with Interim || Done || FwD || | ||
|- | |- | ||
| Start new bank account at Triodos Bank || Accepted. Awaiting welcome package and account number || FwD || | | Start new bank account at Triodos Bank || Accepted. Awaiting welcome package and account number || FwD || | ||
| Line 45: | Line 45: | ||
| Obtain moving boxes || Done || Everyone || | | Obtain moving boxes || Done || Everyone || | ||
|- | |- | ||
| Packing up everything that needs to be moved || In progress, 95% (?) done || Everyone || | | Packing up everything that needs to be moved || In progress, 95% (?) done || Everyone || | ||
|- | |- | ||
| Logistics: moving stuff to the new space || In progress. Key is available in old space || Everyone || | | Logistics: moving stuff to the new space || In progress. Key is available in old space || Everyone || | ||
|- | |- | ||
| Wired and wireless internet to space and tenants || planning || buZz || asap | | Wired and wireless internet to space and tenants || planning || buZz || asap | ||
Revision as of 16:40, 3 August 2013
| NURDspace Project | |
|---|---|
| Participants | |
| Skills | |
| Status | |
| Niche | |
| Purpose | |
| Tool | |
| Location | |
| Cost | |
| Tool category | |
{{{Name}}}Property "Tool Name" (as page type) with input value "{{{Name}}}" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. Property "Tool Image" (as page type) with input value "File:{{{Picture}}}" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. {{{Picture}}} {{#if:{{{Tool}}} | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:{{{Tool}}} | [[Tool Cost::{{{Cost}}} | }}
We're gonna move to a new location.
- Current building must be empty per 15-08-2013
- Contract for new building will be signed 01-08-2013 11:00
- New building available from that moment on
Planning and status
| Aspect | Status | Who | Date / period |
|---|---|---|---|
| Cancel Bewaakt & Bewoond contract per august 15th | Agreed upon with B&B account manager | FwD | 15-08-2013 |
| Oplevering old space | Planned | BuZz | 15-08-2013 |
| Negotiate content of new contract and agreement with Interim | Done | FwD | |
| Fiber possibilities | Investigated, now disconnected, hopefully soon in a legal way. | CrossWire | |
| Move BIT ADSL | Moved to "ISRA001/AUTOMAATRUIMTE, invoerkabel 1, dikader 3", but not found yet. KPN appointment 6-8 14:00-16:00 | buZz | 6-8 14:00-16:00 |
| Discuss internet connection costs with other tenants | 1 cancellation received, others are positive and interested | FwD | |
| Obtain keys | Done. | FwD | |
| New locks on server room door on 2nd floor | Done | FwD | |
| New locks on space doors (current space doors are Nemef nr. 30 and can be bought anywhere) | Done, but in a mediocre way. No cover plates on the doors yet. | FwD | |
| Sign contract with Interim | Done | FwD | |
| Start new bank account at Triodos Bank | Accepted. Awaiting welcome package and account number | FwD | |
| Add FwD and remove Bjorn from KvK-inscription | Done | FwD & Björnl | |
| Switch automatic payment from Bewaakt & Bewoond to Interim | Depends on arrival of new bank account | Bjorn or FwD | |
| Throw away old stuff from current space | Done. | Everyone | |
| Obtain moving boxes | Done | Everyone | |
| Packing up everything that needs to be moved | In progress, 95% (?) done | Everyone | |
| Logistics: moving stuff to the new space | In progress. Key is available in old space | Everyone | |
| Wired and wireless internet to space and tenants | planning | buZz | asap |
Specs of the new space
See the location page.
Status of the old space
See for yourself: