Monkeyopolis: Difference between revisions

From NURDspace
Line 35: Line 35:
=Bill of Materials=
=Bill of Materials=
* tarpaulin:
* tarpaulin:
** at least 15*10m. like [http://www.dekzeilen-bestellen.nl/content/index.php?structure_id=4fb4e9bb71d21b6478f9afa9a3e85b66&item_id=PE150-1015 this one] for ~110eu '''[ordered]'''
** at least 15*10m. like [http://www.dekzeilen-bestellen.nl/content/index.php?structure_id=4fb4e9bb71d21b6478f9afa9a3e85b66&item_id=PE150-1015 this one] for ~120eu '''[ordered]'''


* pvc-tubing:
* pvc-tubing:
Line 43: Line 43:


* rebar/herrings:
* rebar/herrings:
** the pvc-tubes need to fit over them. about 22*0.5m needed. generally really cheap (<1eu/meter) or free [http://www.dejonghandelsonderneming.nl/a-26189542/staven-betonijzer/betonijzer-staaf-o12-3-mtr-lang/#description ie.] '''[bought]''' (30x 60cm)
** the pvc-tubes need to fit over them. about 22*0.5m needed. generally really cheap (<1eu/meter) or free [http://www.dejonghandelsonderneming.nl/a-26189542/staven-betonijzer/betonijzer-staaf-o12-3-mtr-lang/#description ie.] ~32.50+10eu '''[bought]''' (30x 60cm)


* lots and lots of rope (2x16m + 2x 2x25m + 18x0.3m ~= 100m) - http://www.touwentoko.nl./?54,aanbieding-polyprop-8-mm-haspel-met-100-meter-oranje '''[ordered]'''  
* lots and lots of rope (2x16m + 2x 2x25m + 18x0.3m ~= 100m) - http://www.touwentoko.nl./?54,aanbieding-polyprop-8-mm-haspel-met-100-meter-oranje '''[ordered]'''  


* PVC-glue '''[bought]'''
* PVC-glue ~10eu '''[bought]'''
* Duct-tape '''[had]'''
* Duct-tape '''[had]'''
* Tie Wraps '''[arranged]'''
* Tie Wraps '''[arranged]'''
* ..
* ..
total: 120+125+32.50+10+10 = 297.5eu


=Cost=
=Cost=

Revision as of 20:35, 21 July 2015

MonkeyNurd
MonkeyNurd.jpg
Participants
Skills geometry
Status Planning
Niche Hardware
Purpose Infrastructure
Tool No
Location
Cost
Tool category

MonkeyNurd Property "Tool Image" (as page type) with input value "File:" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.

{{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}

As Idiopolis, we have this super cool army tent at our disposal, but it's getting a bit flimsy, and it is not entirely sure how long it will survive. On top of that, all our party tent have been frankensteined into a mother of all partytents at haxogreen, but unfortunatly it has met its demise at the hand of the weather gods. I believe this provides us with ample arguments to consider a new construction for idiopolis, after all, CCC camp is just around the corner.

Plan

Build a so called 'monkeyhut', which is pretty much the default shelter-construction at Burning Man. It uses relatively little materials with a good amount of space in return.

Design

The basic design according to 'Jeremy':

Stuff

IMG 20150710 105046.jpg

This is ;

  • 27x 4m 32mm pipe
  • 2x 4m 40mm pipe
  • 1x 2m 40mm pipe

Bill of Materials

  • tarpaulin:
    • at least 15*10m. like this one for ~120eu [ordered]
  • rebar/herrings:
    • the pvc-tubes need to fit over them. about 22*0.5m needed. generally really cheap (<1eu/meter) or free ie. ~32.50+10eu [bought] (30x 60cm)
  • PVC-glue ~10eu [bought]
  • Duct-tape [had]
  • Tie Wraps [arranged]
  • ..


total: 120+125+32.50+10+10 = 297.5eu

Cost

It would be nice if we could stay under 300 euros or something. (which we are approximately at. woooh!)