Moving to Diedenoort: Difference between revisions

From NURDspace
mNo edit summary
mNo edit summary
Line 19: Line 19:
| Oplevering old space || Planned || BuZz || 15-08-2013
| Oplevering old space || Planned || BuZz || 15-08-2013
|-
|-
| Negotiate content of new contract and agreement with Interim || Done, will hear from Pascal regarding maintenance of installations || FwD ||
| Negotiate content of new contract and agreement with Interim || Done || FwD ||
|-
|-
| Fiber possibilities || Investigated, now disconnected, hopefully soon in a legal way. || CrossWire ||
| Fiber possibilities || Investigated, now disconnected, hopefully soon in a legal way. || CrossWire ||
|-
|-
| Move BIT ADSL || Moved to "ISRA001/AUTOMAATRUIMTE, invoerkabel 1, dikader 3", but not found yet. KPN appointment 6-8 14:00-16:00 || buZz || asap
| Move BIT ADSL || Moved to "ISRA001/AUTOMAATRUIMTE, invoerkabel 1, dikader 3", but not found yet. KPN appointment 6-8 14:00-16:00 || buZz || 6-8 14:00-16:00
|-
|-
| Discuss internet connection costs with other tenants || 1 cancellation received, others are positive and interested || FwD ||
| Discuss internet connection costs with other tenants || 1 cancellation received, others are positive and interested || FwD ||
Line 31: Line 31:
| New locks on server room door on 2nd floor || Done || FwD ||
| New locks on server room door on 2nd floor || Done || FwD ||
|-
|-
| New locks on space doors (current space doors are Nemef nr. 30 and can be bought anywhere) || Pascal (Interim) will take care of this when we sign the contract because he needs a bit of help || FwD || 01-08-2013 11:00
| New locks on space doors (current space doors are Nemef nr. 30 and can be bought anywhere) || Done, but in a mediocre way. No cover plates on the doors yet. || FwD ||
|-
|-
| Sign contract with Interim || Planned || FwD || 01-08-2013 11:00
| Sign contract with Interim || Done || FwD ||
|-
|-
| Start new bank account at Triodos Bank || Accepted. Awaiting welcome package and account number || FwD ||
| Start new bank account at Triodos Bank || Accepted. Awaiting welcome package and account number || FwD ||
Line 45: Line 45:
| Obtain moving boxes || Done || Everyone ||
| Obtain moving boxes || Done || Everyone ||
|-
|-
| Packing up everything that needs to be moved || In progress, 95% (?) done || Everyone || Now!
| Packing up everything that needs to be moved || In progress, 95% (?) done || Everyone ||
|-
|-
| Logistics: moving stuff to the new space || In progress. Key is available in old space || Everyone || Now!
| Logistics: moving stuff to the new space || In progress. Key is available in old space || Everyone ||
|-
|-
| Wired and wireless internet to space and tenants || planning || buZz || asap
| Wired and wireless internet to space and tenants || planning || buZz || asap

Revision as of 17:40, 3 August 2013

NURDspace Project
link=File:{{{Name}}}.jpg
Participants
Skills
Status
Niche
Purpose
Tool
Location
Cost
Tool category

{{{Name}}}Property "Tool Name" (as page type) with input value "{{{Name}}}" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. Property "Tool Image" (as page type) with input value "File:{{{Picture}}}" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. {{{Picture}}} {{#if:{{{Tool}}} | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:{{{Tool}}} | [[Tool Cost::{{{Cost}}} | }}

We're gonna move to a new location.

  • Current building must be empty per 15-08-2013
  • Contract for new building will be signed 01-08-2013 11:00
  • New building available from that moment on

Planning and status

Aspect Status Who Date / period
Cancel Bewaakt & Bewoond contract per august 15th Agreed upon with B&B account manager FwD 15-08-2013
Oplevering old space Planned BuZz 15-08-2013
Negotiate content of new contract and agreement with Interim Done FwD
Fiber possibilities Investigated, now disconnected, hopefully soon in a legal way. CrossWire
Move BIT ADSL Moved to "ISRA001/AUTOMAATRUIMTE, invoerkabel 1, dikader 3", but not found yet. KPN appointment 6-8 14:00-16:00 buZz 6-8 14:00-16:00
Discuss internet connection costs with other tenants 1 cancellation received, others are positive and interested FwD
Obtain keys Done. FwD
New locks on server room door on 2nd floor Done FwD
New locks on space doors (current space doors are Nemef nr. 30 and can be bought anywhere) Done, but in a mediocre way. No cover plates on the doors yet. FwD
Sign contract with Interim Done FwD
Start new bank account at Triodos Bank Accepted. Awaiting welcome package and account number FwD
Add FwD and remove Bjorn from KvK-inscription Done FwD & Björnl
Switch automatic payment from Bewaakt & Bewoond to Interim Depends on arrival of new bank account Bjorn or FwD
Throw away old stuff from current space Done. Everyone
Obtain moving boxes Done Everyone
Packing up everything that needs to be moved In progress, 95% (?) done Everyone
Logistics: moving stuff to the new space In progress. Key is available in old space Everyone
Wired and wireless internet to space and tenants planning buZz asap

Specs of the new space

See the location page.

Status of the old space

See for yourself:

WP 20130802 003.jpg