Moving to Diedenoort: Difference between revisions

From NURDspace
(Created page with "{{Project |ProjectSkills=packing, sorting, moving, unpacking |ProjectStatus=Planning |ProjectNiche=Other |ProjectPurpose=Infrastructure }} We're gonna move to a new location. ...")
 
mNo edit summary
 
(30 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Project
{{Project
|ProjectSkills=packing, sorting, moving, unpacking
|Name=Moving
|ProjectStatus=Planning
|Skills=packing, sorting, moving, unpacking
|ProjectNiche=Other
|Status=Finished
|ProjectPurpose=Infrastructure
|Niche=Other
|Purpose=Infrastructure
|Picture=
|Tool=No
|Location=
|Cost=
|Category=
}}
}}
We're gonna move to a new location.
We're gonna move to a new location.
Line 13: Line 19:


{|class="wikitable"
{|class="wikitable"
! Aspect !! Status !! Contact person / Responsible
! Aspect !! Status !! Who !! Date / period
|-
|-
| Cancel Bewaakt & Bewoond contract per august 15th || Agreed upon with B&B account manager || FwD
| Cancel Bewaakt & Bewoond contract per august 15th || Done || FwD ||
|-
|-
| Negotiate content of new contract and agreement with Interim || Appointment to be made with Interim account manager || FwD
| Oplevering old space || Done || BuZz || 15-08-2013
|-
|-
| Sign contract with Interim || Planned for 01-08-2013 11:00 || FwD
| Negotiate content of new contract and agreement with Interim || Done || FwD ||
|-
|-
| Start new bank account at Triodos Bank || Paperwork in progress || FwD
| Fiber possibilities || Investigated, now waiting on KPN to find the fiber again as they managed to have lost it. || CrossWire ||
|-
|-
| Switch automatic payment from Bewaakt & Bewoond to Interim || Depends on arrival of new bank account || Bjorn
| Move BIT ADSL || Done || buZz ||
|-
|-
| Throw away old stuff from current space || ... || Everyone
| Discuss internet connection costs with other tenants || 1 cancellation received, others are positive and interested || FwD ||
|-
|-
| Obtain moving boxes || planning || Everyone
| Obtain keys || Done. || FwD ||
|-
|-
| Packing up everything that needs to be moved || ... || Everyone
| New locks on server room door on 2nd floor || Done || FwD ||
|-
|-
| Logistics: moving stuff to the new space || Cars have been offered by Sander2 and Theo || Everyone
| New locks on space doors (current space doors are Nemef nr. 30 and can be bought anywhere) || Done, but in a mediocre way. No cover plates on the doors yet. || FwD ||
|-
|-
| Internet connection in new space || planning, negotiating with BIT || buZz
| Sign contract with Interim || Done || FwD ||
|-
|-
| Wired and wireless internet to space and tenants || planning || buZz
| Start new bank account at Triodos Bank || Done || FwD ||
|-
| Add FwD and remove Bjorn from KvK-inscription || Done || FwD & Björnl ||
|-
| Switch automatic payment from Bewaakt & Bewoond to Interim || Depends on arrival of new bank account || Bjorn or FwD ||
|-
| Throw away old stuff from current space || Done. || Everyone ||
|-
| Obtain moving boxes || Done || Everyone ||
|-
| Packing up everything that needs to be moved || Done || Everyone ||
|-
| Logistics: moving stuff to the new space || Done || Everyone ||
|-
| Wired and wireless internet to space and tenants || in progress (done?) || buZz || asap
|}
|}


= Specs of the new space =
= Specs of the new space =
See the [[Location|location page]].
See the [[Location|location page]].
= Status of the old space =
See for yourself:
[[File:WP_20130802_003.jpg|800px]]

Latest revision as of 09:54, 26 August 2014

Moving
NoPicture.png
Participants
Skills packing, sorting, moving, unpacking
Status Finished
Niche Other
Purpose Infrastructure
Tool No
Location
Cost
Tool category

Moving Property "Tool Image" (as page type) with input value "File:" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.

{{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost:: | }}

We're gonna move to a new location.

  • Current building must be empty per 15-08-2013
  • Contract for new building will be signed 01-08-2013 11:00
  • New building available from that moment on

Planning and status

Aspect Status Who Date / period
Cancel Bewaakt & Bewoond contract per august 15th Done FwD
Oplevering old space Done BuZz 15-08-2013
Negotiate content of new contract and agreement with Interim Done FwD
Fiber possibilities Investigated, now waiting on KPN to find the fiber again as they managed to have lost it. CrossWire
Move BIT ADSL Done buZz
Discuss internet connection costs with other tenants 1 cancellation received, others are positive and interested FwD
Obtain keys Done. FwD
New locks on server room door on 2nd floor Done FwD
New locks on space doors (current space doors are Nemef nr. 30 and can be bought anywhere) Done, but in a mediocre way. No cover plates on the doors yet. FwD
Sign contract with Interim Done FwD
Start new bank account at Triodos Bank Done FwD
Add FwD and remove Bjorn from KvK-inscription Done FwD & Björnl
Switch automatic payment from Bewaakt & Bewoond to Interim Depends on arrival of new bank account Bjorn or FwD
Throw away old stuff from current space Done. Everyone
Obtain moving boxes Done Everyone
Packing up everything that needs to be moved Done Everyone
Logistics: moving stuff to the new space Done Everyone
Wired and wireless internet to space and tenants in progress (done?) buZz asap

Specs of the new space

See the location page.

Status of the old space

See for yourself:

WP 20130802 003.jpg