The current distribution board was approved on 5 Jul 2024, ordered on 12 Jul 2024 and installed on 15 Jul 2024.
The current distribution board was approved on 5 Jul 2024, ordered on 12 Jul 2024 and installed on 15 Jul 2024.


== Hardware ==
= Hardware =
The current hardware of the distribution board consists of the following:
The current hardware of the distribution board consists of the following:
{| class="wikitable"
{| class="wikitable"
Line 127: Line 127:
Article numbers are from [https://www.sandervunderink.nl Sander Vunderink].
Article numbers are from [https://www.sandervunderink.nl Sander Vunderink].


== Layout ==
= Layout =
[[File:Groepenkast layout.png|800px]]
[[File:Groepenkast layout.png|800px]]


Line 134: Line 134:
Note the DS301C is unknown in the configurator and drawn as 0025.060.
Note the DS301C is unknown in the configurator and drawn as 0025.060.


== Circuits ==
= Circuits =
Currently the new distribution board is mainly just a replacement of the old board. In the future extra circuits can be installed.
Currently the new distribution board is mainly just a replacement of the old board. In the future extra circuits can be installed.


Line 161: Line 161:
Currently all phases are bridged as the grid supply is single phase.
Currently all phases are bridged as the grid supply is single phase.


== Pics ==
= Pics =


[[File:PXL 20240717 095041784.jpg|800px]]
[[File:PXL 20240717 095041784.jpg|800px]]

Revision as of 11:56, 17 July 2024

Distribution board
Abb--600.png
Participants Septillion
Skills
Status In progress
Niche Electricity overhaul
Purpose Infra
Tool No
Location Space
Cost
Tool category Infra

Distribution board

Abb--600.png {{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost::{{{Cost}}} | }}

Page about the distribution board (Dutch: groepenkast or meterkast (for space containing the groepenkast)). Together with the power distribution it is part of the electricity overhaul.

The current distribution board was approved on 5 Jul 2024, ordered on 12 Jul 2024 and installed on 15 Jul 2024.

Hardware

The current hardware of the distribution board consists of the following:

Type Product Amount Article # Note
Enclousure ABB HLD33 2 1SPF006964F0230 2x12 units each
Main switch 3x40A ABB HS404 1 6962160 Not found
B16 P+N 30mA RCBO ABB DS301C 12 2CSR255163R1165 1-phase circuits
B16 3P+N 30mA RCBO ABB DS203NC 1 2CSR256140R1165 Distributiongroup Kast B (Zaal 1)
Small bits and pieces
verbindingsstrip voor aardrail ABB 2742.184 1 6938070 PE between enclousures
Screw M5x10 ABB 7992.150 2 7992150 Screw for PE bar
Klemveer ABB 6938.060 4 6938060 Connection between enclousures
Koppelstuk ABB 6938.080 4 6938080 Connection between enclousures
Inzetstuk 175-00/2 ABB 6932.130 1 6932130 Bottom of left enclousure
Busbar 12pin OEM 1 AP12-18 Busbar of Neutral
Busbar 4pin OEM 3 AP4-18 Busbar of phases
6qmm Blue H07V2-K 2m 4519024ROL2 Wires internal
6qmm Brown H07V2-K 2m 4519034ROL2
6qmm Black H07V2-K 2m 4519014ROL2
6qmm Grey H07V2-K 2m 4519064ROL2
Connection terminal set ABB HFN-AB3 2 1SPF007929F0170
Zadelstrip Eaton Systeem 55 16/19 4 6134709 Stackable

Article numbers are from Sander Vunderink.

Layout

Groepenkast layout.png

Layout in configurator.

Note the DS301C is unknown in the configurator and drawn as 0025.060.

Circuits

Currently the new distribution board is mainly just a replacement of the old board. In the future extra circuits can be installed.

# Type Phase What
B9 3P+N B16/30mA All Distribution circuit to Kast B (Zaal 1) for the old Groep 1, 2 and 3.
C7 P+N B16/30mA L2 Old Groep A (Groep 4)
HS 4P 40A All Main switch (Hoofdschakelaar) to grid

Currently all phases are bridged as the grid supply is single phase.