No edit summary |
(add MJOP files) |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
Please collect here all the things you think are requiring maintenance soonish. | |||
Todo list: [[Media:BIJN-MJOP_bouwkundig_rapport_2021.pdf|Bouwkundig raport]] | |||
Budget: [[Media:BIJN-MJOP_begroting_2021.pdf|Bouwkundige begroting]] | |||
{{Project | {{Project | ||
|Name=Volkshuis onderhoud | |Name=Volkshuis onderhoud | ||
Line 8: | Line 14: | ||
|Category=Infra | |Category=Infra | ||
}} | }} | ||
== Bar == | |||
* Ventilation isn't operated by HASS and uses a bit excessive power, replace? | |||
== Outside == | |||
* Possible wasp nest on side were sign used to be (corner zaal 3) | |||
* Doorframe of frontdoor needs love/replacement | |||
* Almost -all- outside windowframes are rotted or rotting | |||
== Toilet == | |||
* Toilet is leaking between the reservoir and the bowl | * Toilet is leaking between the reservoir and the bowl | ||
* Toiletreservoir is not attached to wall | * Toiletreservoir is not attached to wall | ||
== Smokeroom == | |||
* Remove smokeroom sink & doorframe & remainder of wall | * Remove smokeroom sink & doorframe & remainder of wall | ||
* Close all sewer connections | |||
== Zaal 1 == | |||
* Maybe make Airco in zaal1 a permanent installation? | * Maybe make Airco in zaal1 a permanent installation? | ||
== Whole Building == | |||
* Replace all radiatorknobs with wax engines on HASS operated relays. | |||
* Replace all power infra | |||
* Replace all ceiling material |
Latest revision as of 22:57, 21 February 2024
Please collect here all the things you think are requiring maintenance soonish.
Todo list: Bouwkundig raport
Budget: Bouwkundige begroting
Volkshuis onderhoud | |
---|---|
Participants | Berend |
Skills | |
Status | Active as fuck |
Niche | Building maintenance |
Purpose | Repair and renovation |
Tool | No |
Location | |
Cost | |
Tool category | Infra |
Ed & Willem Bever 1.png {{#if:No | [[Tool Owner::{{{ProjectParticipants}}} | }} {{#if:No | [[Tool Cost::{{{Cost}}} | }}
Bar
- Ventilation isn't operated by HASS and uses a bit excessive power, replace?
Outside
- Possible wasp nest on side were sign used to be (corner zaal 3)
- Doorframe of frontdoor needs love/replacement
- Almost -all- outside windowframes are rotted or rotting
Toilet
- Toilet is leaking between the reservoir and the bowl
- Toiletreservoir is not attached to wall
Smokeroom
- Remove smokeroom sink & doorframe & remainder of wall
- Close all sewer connections
Zaal 1
- Maybe make Airco in zaal1 a permanent installation?
Whole Building
- Replace all radiatorknobs with wax engines on HASS operated relays.
- Replace all power infra
- Replace all ceiling material